Stage 1



start position: Shooter is standing facing sink with hands on both knobs. Gun is loaded to division capacity and holster.
Procedure: On the start signal pull the cord, turn and engage T1-T2 in the open.
Engage T3-T4-T5 using avalable cover. Engage T6-T7-T8 from low cover.